Project Detail

I Solar Power Project by Future Energy (UCR ID Number: 555)

Approved For Verification
QR Code

Project Description

The I Solar Power Project by Future Energy (hereafter referred to as “project”) consists of three solar power plants installed in São Desidério, state of Bahia, and Poço Redondo, state of Sergipe. The promoter of the project is FUTURE ENERGY ONE BRASIL INTEGRADORA E COMERCIALIZADORA DE ENERGIA LIMPA LTDA., a company that owns the solar power plants in a business model. The purpose of the project is to install and operate three new solar power plants at different locations, supplying the generated electricity to the National Interconnected System (Sistema Interligado Nacional - SIN). The project has a total capacity of 8.998 MW. Since each power plant has an installed capacity of less than 5 MW, they are classified as mini-generation units under Brazil’s electricity compensation system, regulated by the National Electric Energy Agency (ANEEL), in accordance with Normative Resolutions No. 482/2012, No. 687/2015, and Federal Law No. 14.300/2022. Under this system, the active energy injected by a consumer unit with distributed mini-generation is transferred, as a free loan, to the local distributor and subsequently compensated by offsetting the unit's consumption.

Project Category

CoU

Project Files

Location

Brazil

Type

Solar

Authorized Project Contact

Future Energy

Project Proponent

745034294