27.5 MW Biomass Based Grid Connected Electricity Generation Project in DCM Shriram, Ajbapur Plant (UCR ID Number: 416)
Approved For VerificationProject Description
The purpose of the project activity is to generate electricity from renewable resource and supply it to national grid. The project activity involves upgradation of one existing boiler and installation of two new 60 TPH high pressure energy efficient boiler and installation of two new turbine of capacity 7.5 MW and 20 MW. The project activity is expected to supply 168,192 MWh of electricity to the national grid each year.
Project Category
CoU
Project Files
Location
Uttar Pradesh
Type
Biomass Energy
Authorized Project Contact
DCM Shriram Limited
Project Proponent
795937310